10.jpg
10.jpg
10.jpg

Aramco: Master Gas Expansion Phase-it

Noor Seal executed this strategic energy infrastructure project to expand Aramco's natural gas distribution network in the Eastern Province. The scope included installing 120km of high-pressure steel pipelines (48-inch diameter) connecting gas processing plants to industrial hubs.

Our team deployed automated welding systems meeting API 5L X70 standards, with X-ray testing for 100% joint integrity. The project incorporated three compressor stations equipped with 25MW turbines to maintain optimal pressure across the network. We implemented Aramco's SCADA-based monitoring system for real-time leak detection and remote flow control.

Environmental safeguards included zero-flaring technology and habitat restoration along the pipeline corridor. The completed expansion increased gas delivery capacity by 30%, supporting Saudi Arabia's industrial diversification goals under Vision 2030.

Key Deliverables:

8km of heated stone pavements (for winter comfort). Heritage-style LED lighting (2,500 lumens, 3000K temperature). Native landscaping (drought-resistant sidr trees and athan shrubs).

Duration:

14 months (2024–2025).

Rating :